Okspcc.com ​epa spcc spill plans

Our Services:


New SPCC Spill Plans.......... $349.00 plus travel
Annual Inspections ................$49.00 plus travel
Five Year Review.....................$49.00 plus travel
Employee Annual Training .........................Call for Quote
Commercial SWD and Bulk Storage ............Call for Quote

Drilling Rigs, Marinas, & Other Facilities......Call for Quote


Travel Expense.  Normally charge $0.85 per mile and Per Diem depending upon location


Facilities with more than a normal 6 to 8 vessel battery ( Heater Treator, Seperator, FWKO, Salt Water Tank, Two to Three Oil Tanks) additional charge of $10 per vessel. 


Five Year Review:  EPA requires Annual Inspections attached to SPCC.  If no Annual Inspection is conducted, and it is time for a Five Year Review, a New SPCC must be completed and signed by PE.


After Annual Inspection and facility battery vessels uses are changed then a New SPCC must be completed and signed by PE, unless changes are minor and can be made without affecting containment total volumes.


Contingency Plans for Flow Lines from Well Head to Tank Batter, and from Tank Battery to Injection or SWD well, are included in all SPCC and if your current SPCC has no Flow Line Contingency, then the SPCC is VOID, and subject to a fine by the EPA. 


                  www.OKSPCC.COM
                       918-671-7777 


Okspcc.com Epa Spcc Spill Plans

As environmental engineering consultants OKSPCC.COM provides Spill Plans, Annual Inspections, &  Employee Training.